This is dream for now that we will be surfing Metro Train In Kathmandu near Future. The main station of the Metro will be at Jamal as revealed by Department of Railway Nepal. The Facts of This Metro Railway , I summarized in this way.
Total Length : 66.1 K.M.
Speed of Metro :160Km/hr
No of metro line :5
Total no of station :32
First Line : 18 station starting from Kalanki-Maharajgunj-Satdobato- Kalanki .
Second Line : 5 station Starting From Balkhu to Chabahil.
Third line :7 station Kotesor -Jamal-Gongabu.
Fourth line :9 station Satdobato-SahidGate-Narayanhiti-NarayanGopal Chowk.
5th line :6 station Kalanki -Kalimati-Dilibazar-Sinamangal.
Of all ,Transit point will be Kalanki-SahidGate-Jamal-Chabahil-Tinkune-NarayanGopalchowk-Sinamangal-Balkhu
Contactors:
Korea Chungsung Enggineering
IMIC and BDA Nepal
Total Length : 66.1 K.M.
Speed of Metro :160Km/hr
No of metro line :5
Total no of station :32
First Line : 18 station starting from Kalanki-Maharajgunj-Satdobato- Kalanki .
Second Line : 5 station Starting From Balkhu to Chabahil.
Third line :7 station Kotesor -Jamal-Gongabu.
Fourth line :9 station Satdobato-SahidGate-Narayanhiti-NarayanGopal Chowk.
5th line :6 station Kalanki -Kalimati-Dilibazar-Sinamangal.
Of all ,Transit point will be Kalanki-SahidGate-Jamal-Chabahil-Tinkune-NarayanGopalchowk-Sinamangal-Balkhu
Contactors:
Korea Chungsung Enggineering
IMIC and BDA Nepal
No comments:
Post a Comment